Profile
    • Today's News
    • We are hiring!
    Menu
    • Today's News
    • We are hiring!
  • Register
  • Log in
  • Wishlist 0
  • Shopping cart 0
Atomik Climbing Holds
Menu
  • Deals of the Day
  • Products
    • New
    • Training
    • Climbing Holds
    • Supplies
  • Colors
  • FAQs
  • How-To
    • Build a Climbing Wall Book
    • Which Hold Type is Right for You?
    • How To Choose Holds On A Budget
    • Different Lengths of Bolts and Why.
    • T-nut Layouts
    • Hold Layouts
    • Zinc versus Stainless Steel
    • How To Measure A Bolt
    • Drywall is NEVER okay.
    • Setting Your First Boulder Problem
    • Bolt-On Holds to Wood
    • Wall Angle Chart
    • Bolt-On Holds to Concrete
    • Screw-On Holds to Wood
    • Screw-On Holds to Concrete
    • Garage Climbing Wall
    • Artistic Kid’s Wall
    • How To Build a Ninja Ceiling Panel
    • Bolt Hangar on 2" x 6" Joist
    • Training Hang Board
    • Climbing Holds to a Tree
    • How To Girth Hitch
  • MEDIA
    • Photo Gallery
    • Logos
    • Testimonials
    • Video Gallery
Menu
  • Deals of the Day
  • Products
    • New
    • Training
    • Climbing Holds
    • Supplies
  • Colors
  • FAQs
  • How-To
    • Build a Climbing Wall Book
    • Which Hold Type is Right for You?
    • How To Choose Holds On A Budget
    • Different Lengths of Bolts and Why.
    • T-nut Layouts
    • Hold Layouts
    • Zinc versus Stainless Steel
    • How To Measure A Bolt
    • Drywall is NEVER okay.
    • Setting Your First Boulder Problem
    • Bolt-On Holds to Wood
    • Wall Angle Chart
    • Bolt-On Holds to Concrete
    • Screw-On Holds to Wood
    • Screw-On Holds to Concrete
    • Garage Climbing Wall
    • Artistic Kid’s Wall
    • How To Build a Ninja Ceiling Panel
    • Bolt Hangar on 2" x 6" Joist
    • Training Hang Board
    • Climbing Holds to a Tree
    • How To Girth Hitch
  • MEDIA
    • Photo Gallery
    • Logos
    • Testimonials
    • Video Gallery
0
0
Search
Shopping cart
You have no items in your shopping cart.
  • Home /
  • Products /
  • Training /
  • HangBoards /
  • Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )
Picture of Ninja Ceiling Panel ( 24" x 24" )

Ninja Ceiling Panel ( 24" x 24" )

1 review(s) | Add your review
$107.71
Most of the work is done for you with this rock climbing system!
*
  • Overview
  • Reviews

When you want to challenge yourself during climbing and ninja warrior training, this ceiling climbing wall is a great option! 

Rock Climbing System Specifications:

  • 2' tall x 2' wide x 1.5" thick
  • 3/4" Furniture Grade Plywood (unfinished) mounted on 3/4" furring strips
  • 9 Industrial grade t-nuts installed
  • Comes with 10-5" Torx screws for installing the panel.
  • Rough-sanded finish to decrease spinning of holds 
  • ***You will need to drill your own 1/4" mounting holes so the board is attached to at least two ceiling joists with a minimum of 5 screws per joist into a structural material such as a joist or a beam
  • Hanging products are not included

 

Installation Steps

  • Locate the joists
  • Center Panel on at least 2 ceiling joists
  • Drill a minimum of 5 x 3/16" pilot holes per joist
  • Attach panel to the ceiling with at a minimum of 3" embedment into structural material. That means 1-1/2" (panel thickness) + 1/2" (drywall) + 3" (embedment) = 5" screw. We will send 10-5" Torx head screws.

When you want to challenge yourself during climbing and ninja warrior training, this ceiling climbing wall is a great option! 

Rock Climbing System Specifications:

  • 2' tall x 2' wide x 1.5" thick
  • 3/4" Furniture Grade Plywood (unfinished) mounted on 3/4" furring strips
  • 9 Industrial grade t-nuts installed
  • Comes with 10-5" Torx screws for installing the panel.
  • Rough-sanded finish to decrease spinning of holds 
  • ***You will need to drill your own 1/4" mounting holes so the board is attached to at least two ceiling joists with a minimum of 5 screws per joist into a structural material such as a joist or a beam
  • Hanging products are not included

 

Installation Steps

  • Locate the joists
  • Center Panel on at least 2 ceiling joists
  • Drill a minimum of 5 x 3/16" pilot holes per joist
  • Attach panel to the ceiling with at a minimum of 3" embedment into structural material. That means 1-1/2" (panel thickness) + 1/2" (drywall) + 3" (embedment) = 5" screw. We will send 10-5" Torx head screws.
Product tags
  • hangboard (6)
  • ,
  • diy hangboard (15)
Also Bought
Picture of T-nut (Round Base Zinc)

T-nut (Round Base Zinc)

3/8-16 Zinc Round Base T-nuts

$0.25
Picture of Stainless Steel Bolt Hanger

Stainless Steel Bolt Hanger

$5.95
Picture of 2.5" Small Bombs (Set of 2)

2.5" Small Bombs (Set of 2)

For your little Ninja Warrior

$31.50
Picture of Heavy Duty Lag Screw Eye Bolt (1/2" x 3-1/4")

Heavy Duty Lag Screw Eye Bolt (1/2" x 3-1/4")

Industry approved heavy duty closed eye bolt for hanging ninja products

$6.52
Picture of 32" Dynex Slings (Set of 2)

32" Dynex Slings (Set of 2)

Sold as a set of 2.

$27.99

55 East 600 South, Provo, Utah 84606

Tel. 801-404-0280 | atomikholds@gmail.com


Information
  • FAQs
  • About Us
  • Warranty
  • Cut Sheets
  • Sitemap
  • Contact us
Customer service
  • Search
  • Recently viewed
  • Privacy policy
  • Conditions of Use
My account
  • My account
  • Orders
  • Addresses
  • Shopping cart
  • Wishlist
Powered by nopCommerce
Copyright © 2021 Atomik Climbing Holds. All rights reserved.